Infrastructure

New plant

Located at 

1.2 miles  from the mine

Capacity:

300 tons a day

Recovery:

90%

Estimated production

3.500 onz/m

Lab facilities

The Chemical-Metallurgical Laboratory must be implemented, with respect to the equipment currently available, for fire test analysis, for determination of Gold and Silver by the combined method (Fire Assay-Atomic Absorption) or gravimetric method (weighing in micro balance), as well as metallurgical tests to determine the cyanidation kinetics and optimization of the Grinding, CIP, CIL, MERRILL CROW, ADR PROCESS process.

Actual mine operations